| FEATURES | APPLICATIONS | SPECIFICATIONS |
|
Concrete basin systems are also available. Operation Influent enters the plate clarifier through an inlet nozzle and discharges into a flow distribution zone located across the width of the clarifier. Flow is directed downward, under the parallel plates, then up through the spaces between the plates. Clear supernatant is collected at the top of the plate area by an effluent launder, equipped with hydraulically designed orifices, to evenly collect the discharge from each plate area. Solids settle on the parallel plates and slide down the plates into a sludge collecting hopper where gravity thickening occurs. Design Plates are inclined at a 60 degree angle to insure that solids do not adhere and block the plate open area. Plate spacing is 2". |
| FEATURES | APPLICATIONS | SPECIFICATIONS |